Working prototype · Hybrid Waterfall · view intake answers

Jira: not connected
Waterfall locks
Living plan

Capacity & cost

Computed live from the current sprint plan — never stored, never stale. Capacity = 6 people × 80 hrs × 70% utilization − 15% buffer ÷ 8 hrs/point = 35 points/sprint.

Why:One capacity number drives both halves of the hybrid model — the waterfall phase timeline and the sprint packing — and the same hours convert into every dollar figure below.

Total planned

6 pts

Total capacity

35.0 pts

Overall utilization

17%

On track

Cost model (§17–§24)

Sprint labor cost

$33,600

336 hrs × $100/hr

Cost per story point

$960

$33,600 ÷ 35 pts

Planned work cost

$5,760

6 pts × $960

Estimated initiative cost

$33,600

1 sprints × $33,600

Unused capacity cost

$27,840

allocated − planned work

Budget variance

−$66,400

-66.4% vs $100,000 budget

On track

Cost & capacity assumptions

Configurable prototype assumptions (§31) — editing them recalculates sprints, capacity and every cost figure. Locked planning layers are never changed.

Sprint-by-sprint forecast

Sprint 1
6
6 / 35.0 pts (-82.9%) · $5,760

Estimates are generated using configurable prototype assumptions. Story points are relative estimates and should not be treated as guaranteed hours, dates, or financial commitments. Teams should replace default assumptions with validated historical data when available.